Body corporate EV charging guide

Learn more about the process of installing EV infrastructure in an apartment building or high-rise.

Is your building prepared for the EV wave?

As the EV movement gains traction in Australia, body corporates and strata managers are recognizing the advantages of incorporating EV charging infrastructure sooner in terms of their environmental impact, property values and ongoing costs.

However, integrating and retrofitting EV charging stations into strata communities can be a complex process. It’s important to choose a technical partner that’s equipped to handle the EV transition for your property now and into the future.

EV charging options for apartments

The viability and costs for each option will vary substantially based on your existing electrical infrastructure, parking lot layouts, and other factors. We recommend to all Body Corporates organise an initial site visit and site energy assessment report.

1. Staged delivery

  • Phased rollout of EV infrastructure
  • Triggered upscaling from monitoring
  • Needs-based scaling through zones

2. Whole of building

  • Full-scale rollout at one time
  • One-time cost + ongoing support
  • Total ownership of infrastructure

3. Visitor bays only

  • Fast solution for EV capability
  • Interim measure before full solution
  • Can be done alongside or separate

4. Ad-hoc charging

  • Level 1 / “Trickle” chargers
  • Not suitable for apartments
  • Contains many drawbacks

EV charging considerations for body corps

Regulations

Strata resolutions and permissions needed for EV charging infrastructure systems varies from state to state. A full list of resolutions can be found here.

Ongoing Costs

Costs include upgrading existing infrastructure, energy management & cost recovery, insurances and health & safety compliance.

Installation Placement

Installation will differ depending on where the EV charging stations are located – usually either in an exclusive use area or on the common property.

Common parking

For common property areas, consider how you will undertake cost of the installation, authorised users, administration, cost recovery and time limits.

individual parking

Successful bylaws will address handover of information, approvals, proper use, installation, ownership and maintenance.

Maintenance

Ensure proactive support services, triggered scaling and overall operational excellence in your building with a robust maintenance provider.

Process to implement EV charging stations

Your EV infrastructure installation will follow four key steps:

  1. Enlist an EV infrastructure specialist to assess the building’s load capacity and site suitability for EV charging stations.
  2. Collaborate with your specialist to determine right EV charging solution for your needs and compare supplier quotes.
  3. Present the obtained quotes to the Body Corporate for review and oversee the installation process once a contractor is chosen.
  4. Formalise documentation regarding the operation and management of the EV solution and communicate that to your community.

Installation considerations for body corporate

Choosing the right installers

Long-term strategy

Strata committees should agree on a building strategy and roadmap for EV charging capability. Once the is established scope of works is determined, it is then time to go out to tender for works move onto to the approvals and installation project management and site commissioning

EV specialists

The complexity of EV infrastructure projects is greater than many individuals realise, and apartment buildings especially require electrical specialisation in EV, switchboards and building capacity load management. This is often outside a capability of a great deal of general electrical contracting companies.

RIsks of Ad Hoc Installation

Safety concerns

Electrical hazards represents is one of the main concerns connected to EV charging. If not handled appropriately, the high voltage and current required to charge an electric vehicle can be dangerous. A malfunctioning charging could result in electric shocks or flames, resulting in property loss or bodily injury.

Building energy load concerns

The majority of strata buildings have a limited amount of grid electricity that would be exceeded if a few occupants installed a charger without proper management. In such a situation, the mains supply breaker would trip, cutting off power to the entire building. For residents requiring electrical equipment for medical support, this could potentially be fatal.

With EVIAM, you own the infrastructure.

At EVIAM, we install EcoStruxure EV Charging Expert by Schneider Electric, a hardware load management solution for EV infrastructure that communicates with both AC and DC groups of charging stations.

This technology optimises your EV power usage in real-time without compromising the building activities, avoiding costly penalties or even outages caused by the use of multiple EV charging stations at the same time.

We want to keep capital expenditure as exactly that, capital expenditure.  There’s no need to pay monthly or annual subscriptions to access the EV infrastructure you have already paid for.

Just like switchboards, distribution boards and power points, it is yours to own for now and always.

Understanding EV charging

If you live in an apartment building or high rise, we will likely recommend a solution involving AC fast chargers that balance the charging needs of multiple EVs with the power demands of the rest of the building.

Level 1 – AC Slow Chargers

These EV chargers can be plugged into a standard powerpoint or outlet. Although, they are handy to have, they will charge your EV very slowly and cannot be a sustainable or fair ongoing solution in communal parking areas of apartment buildings.

Level 2 – AC Fast Chargers

Five times faster than a Level 1 EV AC Charger, these units do need a dedicated circuit, and when installed, can be separated for individual use and metering. This is the most powerful EV charger you can install at a residential location.

Level 3 – DC Fast Chargers

These chargers are the fastest on the EV market and are most suitable to commercial or fleet environments. Due to the extensive infrastructure needs and high energy draw, DC fast charging in apartment buildings is not practical.

Manage it all with one dedicated provider

With EVIAM as your dedicated asset manager, we protect your investment for years to come and ensure future upgrades and scaling projects are executed properly.

Learn more about we support your building.

Book a site visit

Want to know more about what your building needs?
Schedule a free on-site inspection with one of our technicians.